Building the New Project Page Feature

Linear: move fast with little process (with first Engineering Manager Sabin Roman)
Topic 8 of 13
Published Nov 20, 2024 · Clip 31:29–45:31 (14:02)
Sabin walks through the overhaul of the project page in Linear. A small team of two engineers, one designer, and a customer support person was formed. They started with a kickoff where product shared customer interview insights at a high level, then iterated through a talk-do-show loop: engineering and design hacked on proofs of concept together, showed working things, got feedback, and repeated. Multiple design iterations were needed to introduce a new persona (PM within a project) while keeping engineer flows streamlined. Work was merged to master behind feature flags for internal testing. Once it clicked, they descoped to core value, released to beta customers for feedback, then shipped to GA. The project took about four months. Projects end only when they can be left untouched for a year, then move to maintenance status.