Running tests with all flags on and off

Building Figma Slides with Noah Finer and Jonathan Kaufman

Topic 10 of 12

Published Mar 26, 2025 · Clip 48:44–51:30 (2:46)

The guests describe running the full unit and interaction test suite twice per PR: once with all feature flags off and once with all on. This prevents regressions like tests breaking when a flag is deleted or when another engineer's flag-on behavior changes slide naming. They note that getting a green build in the all-flags-on rollout tests required significant initial effort, with each flag configured for rollout tests.